Ken Friar Bridge - Arsenal

The project

The Ken Friar Bridge (originally the North Bridge) was built in two 180 tonne sections and lifted into place using a 750 tonne crane.

What we did

Oakwood Engineering provided structural services providing assistance to the design and fabrication teams.

Service provided

When

2004